US · AAOI

Applied Optoelectronics, Inc.株:株価、バリュエーション、最新の研究

Record revenue, a slipped capacity plan and a share price that now prices dilution rather than demand

Demand is not the problem: revenue more than doubled year on year to $269.9 million in the third quarter of 2026 and the company turned a small profit, but that profit rested on grants and a reserve release, a delayed Texas build and a 1.6 terabit chip constraint mean the share price now discounts a much smaller, more heavily diluted outcome than management plans.

Communication Equipment2026-11-28更新数値と価格はページの日付時点です
最新価格(+10.48%) US$40.90 価格の時刻 2026-11-27 18:00 レポート基準価格 US$37.02(2026-11-26)
AIの妥当価格 · 2026-11-26のレポートに基づくUS$58.00
分析レンジ · 2026-11-26のレポートに基づくUS$23.00 – US$107.00

事業と資料

Applied Optoelectronics makes the optical parts that move data through fibre: laser chips it grows itself, plug-in modules for data centre and telecom networks, and amplifiers for cable television providers. It sells mainly to hyperscale data centre operators and to cable network operators, and it earns money by supplying high-speed optical modules and the lasers inside them. In the third quarter of 2026, data centre products were 58% of revenue and CATV products 41%, as AI-driven demand pulled the company from a slow amplifier business into a fast-growing supplier of 800G and 1.6 terabit modules.

業種
Communication Equipment
市場
米国株
価格の時刻
2026-11-27 18:00
最新レポート
「Applied Optoelectronics: the growth is real, the schedule slipped, and the shares now price dilution rather than demand」 2026-11-26更新

価値を動かす要因

  • AI data centre demand pulling revenue from $118.6 million to $269.9 million year on year, with data centre revenue up 254% to $155.6 million
  • A three-year long-term agreement with a hyperscale customer worth an expected $1 billion to $1.5 billion of 1.6 terabit revenue, capped near term by chip availability
  • Capacity expansion in Texas and Taiwan, with monthly output approaching 330,000 units and a $471 million monthly data centre run rate targeted for the end of 2027

主なリスク

  • Further delay to the second phase of the Texas expansion because of electrical power and construction problems
  • The 1.6 terabit chip constraint persisting beyond the first quarter of 2027, losing both revenue and the mix-driven gross margin improvement
  • Dilution from continued share sales, with the top ten customers at 99% of revenue and the share count already up from 75.0 million to about 90.8 million in nine months
保存、質問、継続研究

同業の企業

最新の決算解説

追跡

Two things now look settled for Applied Optoelectronics, and one has not. Demand is real and increasingly contractual: on November 24, 2026 the company signed a second multi-year agreement with an exi…

The share price embeds a flat 2027 rather than the contracted ramp · Holding

A second hyperscaler agreement converts AI demand into contracted volume · Stronger

Owning the laser chip turns module volume into higher-margin revenue · Holding

Equity funding of the ramp keeps diluting each shareholder's claim · Weaker

The 1.6T chip constraint, not demand, caps next year's revenue and mix · Holding

Texas power and construction delays keep pushing the revenue run-rate out · Weaker

US restrictions on Chinese transceivers are a two-sided policy bet · Holding

2026-11-25 Shares closed at $37.02 after trading as low as $32.60, with the new agreement overshadowing the financing overhang

2026-11-24 Second hyperscaler long-term agreement commits about $2.2 billion of purchases through 2030

2026-11-17 Form 8-K authorises a fourth at-the-market equity programme of up to $550 million

On November 17, 2026 AOI signed an Equity Distribution Agreement with Raymond James and Needham authorising the sale of up to $550 million of common stock from time to time at market prices, at a commission of 2%.[source:aaoi_8k_2026_11_17_atm] This follows three programmes in 2026 that sold 13.08 million shares for $1.59 billion net through September 30, at average prices of $103.51, $183.06 and $105.36.[source:2026_11_05_2026_11_05_10_q_1d2fd0a4e5] Shares outstanding were 90,770,732 on November 2, 2026.[source:2026_11_05_2026_11_05_10_q_1d2fd0a4e5]

2026-11-17 FCC presses ahead with curbs on new models of Chinese optical transceivers

Reuters reported on November 17, 2026 that the administration plans to press ahead with blocking imports of new models of Chinese optical transceivers despite lobbying by Amazon, Google and Meta, with the Federal Communications Commission positioned to implement the restriction.[source:itif_optics_ban_2026_11_23] The FCC granted technology import waivers on November 20, 2026, and industry commentary describes a possible 65% US bill-of-materials content threshold that would operate at component level because 1.6T digital signal processors come mainly from Broadcom and Marvell.[source:itif_optics_ban_2026_11_23][source:simpletechtrend_1_6t_primer] Chinese suppliers are estimated to supply close to two-thirds of global optical transceiver units, and industry commentary has argued that replacement of that supply could take as long as a decade.[source:itif_optics_ban_2026_11_23]

2026-11-12 Form 8-K reports $102.25 million cash purchase of three Houston buildings

A Form 8-K filed on November 12, 2026 reported the completion on November 6, 2026 of the purchase of three Houston buildings the company had been leasing for $102.25 million in cash, adding about 736,216 square feet of industrial space, with an option to buy two further buildings for about $146.6 million.[source:aaoi_8k_2026_11_12_hightower] The same 8-K carried termination of a material definitive agreement alongside entry into a new one.[source:2026_11_17_recent_event_filings_8_k_6_k_a54bdb0a10]

2026-11-05 Third quarter 2026 results: revenue doubled, first profit, and fourth-quarter guidance below expectations

AOI reported third-quarter revenue of $269.9 million, up 127.5% year on year, with data centre revenue of $155.6 million, up 254%, CATV revenue of $110.9 million, reported gross margin of 28.2%, an operating loss of $1.4 million and net income of $6.3 million or $0.07 per diluted share against a $17.9 million loss a year earlier.[source:2026_11_05_2026_11_05_10_q_1d2fd0a4e5] Adjusted gross margin was 28.7% and adjusted net income $14.8 million or $0.17 per share, which beat the $0.14 consensus.[source:aaoi_q3_2026_earnings_release] Fourth-quarter guidance was revenue of $385 million to $420 million with data-centre revenue of $270 million to $300 million, adjusted gross margin of 29.5% to 31% and adjusted earnings per share of $0.48 to $0.63 on about 96 million shares. Management explained the shortfall against earlier expectations as a customer shifting orders from 800G to 1.6T faster than chips could be supplied, with roughly $450 million of 1.6T orders against $50 million to $70 million of 1.6T revenue expected in the quarter, and cut end-2026 800G and 1.6T capacity to more than 500,000 units a month from 650,000. The shares fell 20.9% that day, from $63.97 to $46.89.[source:aaoi_price_history_stockanalysis]

2026-11-04 Form 8-K reports a $200 million credit agreement and the first hyperscaler long-term agreement

A Form 8-K filed on November 4, 2026 reported entry into a material definitive agreement, termination of a material definitive agreement and creation of a direct financial obligation.[source:2026_11_17_recent_event_filings_8_k_6_k_a54bdb0a10] The related financing is a $200 million credit agreement signed on October 30, 2026 providing $30 million of revolving commitments and $170 million of initial term loans maturing in 2030, and the material agreement is the three-year long-term agreement with a major hyperscale customer signed in October 2026, disclosed in the third-quarter Form 10-Q.[source:2026_11_05_2026_11_05_10_q_1d2fd0a4e5]

2026-11-02 Marvell agrees to acquire Lumentum in a $115 billion all-stock transaction

Marvell announced on November 2, 2026 an all-stock agreement to acquire Lumentum, an implied enterprise value of about $115 billion at roughly $1,132 per Lumentum share, a 23.9% premium to the unaffected close, with 4.500 Marvell shares for each Lumentum share and expected completion in the first half of 2028.[source:marvell_lumentum_2026_11_02] The stated rationale is a category leader in AI connectivity combining Marvell's electrical and optical interconnect and custom silicon with Lumentum's lasers, transceivers and compound-semiconductor manufacturing, with a combined addressable market of $550 billion and more than $1 billion of annual run-rate cost synergies.[source:marvell_lumentum_2026_11_02] Industry analysis has noted that volume supply of 1.6T digital signal processors comes mainly from Broadcom and Marvell on TSMC 3nm capacity, and that digital signal processor allocation rather than indium phosphide sets the ceiling on 2027 1.6T shipments.[source:simpletechtrend_1_6t_primer]

Applied Optoelectronics, Inc.の追跡を見る

このページはAI StockValueが公開資料と構造化データから作成しました。企業研究と情報共有のためのもので、投資助言ではありません。