Financial reporting period: nine months ended September 30, 2026 (third quarter 2026, filed October 28, 2026); last full fiscal year: FY2025.
Core judgment
GE Vernova is now turning a record order book into profit and cash faster than at any point since the spin-off, and the shares have fallen anyway.
Third-quarter revenue rose 26.8% to $12.64 billion. Adjusted EBITDA — the company's own measure of profit before interest, tax, depreciation and amortisation — more than doubled to $1.94 billion, up 140% on a reported basis and 123% on the company's organic basis. Free cash flow, meaning cash left after paying for the equipment the company builds and running the business, reached $5.4 billion in the quarter and $15.3 billion over nine months.〔source〕〔source〕
First, the profit is real, but it is the profit of two-year-old orders.
Management confirmed that shipments of better-priced equipment began with orders placed in the second half of 2024, and that full-year 2026 gas orders are priced roughly 50% above 2025 levels. That lifted the Power segment's EBITDA margin to 21.4% from 13.4% a year earlier.〔source〕 The effect lasts only as long as that cohort of orders is being delivered.
Second, Electrification is now a second engine rather than a supporting business.
Third-quarter revenue rose 51% to $3.86 billion and the segment's EBITDA margin reached 19.1%. About half of the growth is the Prolec GE acquisition; the rest is volume in substations, switchgear and transformers.〔source〕
Third, the cash surge is heavily customer-funded, which makes it both a strength and a soft spot.
Customers paid $45.7 billion in advance for equipment and services by September 30, 2026, up from $25.8 billion at the end of 2025, and that prepayment is what produced the free cash flow.〔source〕
What the share price now argues about.
The order backlog — the value of firm orders the company still has to deliver — reached $196.7 billion at September 30, 2026, about 5.2 times the company's revenue for the whole of 2025. A further $29.3 billion of orders was booked in the third quarter alone, more than double the revenue booked in the same period.〔source〕
Since October 1 the shares have fallen about 20%, closing at $760.87 on November 23, 2026.〔source〕〔source〕
On our numbers, that price would be justified by about $8.2 billion of 2027 adjusted EBITDA, against $10.0 billion in our base case and $10.1 billion in Citi's estimate. The debate is no longer whether the business is improving. It is whether the demand tied to data centres is durable enough to fill a backlog worth more than five years of revenue, and whether the company can hold 20%-plus margins while it spends $9 billion on Trench Group and repairs its wind business.
What the company does and how it earns money
GE Vernova sells the equipment that generates and moves electricity. Its Power segment builds gas, nuclear and hydro turbines and steam equipment. Its Electrification segment builds the grid hardware between power plant and customer: high-voltage substations, transformers, switchgear, converters, storage and control software. Its Wind segment makes onshore and offshore wind turbines and services them.〔source〕
Figure: A cutaway view of the gas turbine technology behind GE Vernova's Power business.; source: gevernova.com.
The economics run in three steps. A utility, an industrial plant or a data-centre developer orders a turbine or a substation, often years ahead of delivery, and pays a deposit. GE Vernova then builds and delivers the equipment, booking most of the profit into its accounts at the moment the equipment ships. Finally it sells a decade or more of maintenance on that equipment under long-term service agreements, usually at a fixed price with a guaranteed availability commitment.〔source〕
That third step is why the business is less cyclical than it looks. Services were $13.0 billion of nine-month revenue against $20.1 billion of equipment revenue, and services carry the higher margins.〔source〕
A typical customer. A data-centre developer in the United States needs firm, always-on electricity on a schedule the grid cannot meet. It therefore orders gas turbines to run its own generation, and it needs a substation to connect that plant to the site. That combination — turbines from Power, substations and transformers from Electrification, and a service contract on both — is what GE Vernova now sells.
Management says roughly 20% of its gas-turbine customers are data-centre related; the other 80% are traditional utilities and industrial buyers spread across about 100 customers in 25 countries.〔source〕
The quarter in numbers
| Measure | Q3 2026 | Q3 2025 | Change | Q2 2026 | Change vs Q2 2026 |
|---|---|---|---|---|---|
| Revenue (USD million) | 12,642 | 9,969 | +26.8% | 11,104 | +13.8% |
| Gross profit (USD million) | 3,107 | 1,897 | +63.8% | 2,360 | +31.7% |
| Gross margin | 24.6% | 19.0% | +5.5 pct | 21.3% | +3.3 pct |
| Operating income (USD million) | 1,394 | 366 | +280.9% | 653 | +113.5% |
| Adjusted EBITDA (USD million) | 1,943 | 811 | +139.6% | 1,250 | +55.4% |
| Net income attributable to GE Vernova (USD million) | 1,291 | 452 | +185.6% | 668 | +93.3% |
| Diluted earnings per share (USD) | 4.81 | 1.64 | +193.3% | 2.47 | +94.7% |
| Free cash flow (USD million) | 5,410 | 733 | +638.1% | 5,106 | +6.0% |
| Backlog, remaining performance obligations (USD billion) | 196.7 | 135.3 | +45.4% | 176.3 | +11.6% |
Segment results, same basis:
| Segment | Revenue Q3 2026 | Revenue YoY | EBITDA Q3 2026 | EBITDA Q3 2025 | Margin Q3 2026 | Margin Q3 2025 |
|---|---|---|---|---|---|---|
| Power | 6,067 | +24.7% | 1,297 | 651 | 21.4% | 13.4% |
| Electrification | 3,862 | +50.6% | 739 | 387 | 19.1% | 15.1% |
| Wind | 2,741 | +3.6% | 72 | (61) | 2.6% | (2.3)% |
| Corporate and other | — | — | (166) | (166) | — | — |
Sources: third-quarter Form 10-Q, second-quarter Form 10-Q and third-quarter earnings call.〔source〕〔source〕〔source〕
{"title": "GE Vernova revenue and net income, FY2021–FY2025 (USD billions)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/5a9f8417-159c-450e-8fe9-c0a359c08850/5a7e7e318bade108/widget-5a7e7e318bade108.html"}
What actually drove the quarter
Price did most of the work, and it came from orders signed two years ago.
Gas equipment booked in the third quarter was priced more than 20% above fourth-quarter 2025 orders, and management expects full-year 2026 gas order pricing per kilowatt of capacity to be roughly 50% above 2025.〔source〕 Because the company was still shipping cheaper 2024 orders until this quarter, the margin step-up arrives now and continues into 2027 as the rest of that cohort ships.
Volume grew too, but far less than the order book implies.
GE Vernova ordered 112 gas turbines worth 16.6 gigawatts of generating capacity, against 29 units and 7.4 gigawatts a year earlier, then delivered 32 units worth 5.3 gigawatts to customers.〔source〕 The gap between what is ordered and what is shipped is the whole investment case: the company is sold out for years and is adding factory capacity to close the gap.
Two order features lift the average price per kilowatt. Aeroderivative turbines — smaller, fast-starting gas engines sold to industrial and backup-power customers — carry a higher price per kilowatt than heavy-duty machines. Slot reservations, where a customer pays to hold a place in the factory's delivery schedule, also raise the effective price and eventually convert into firm orders.〔source〕
{"title": "GE Vernova gas turbine orders and shipments (GW)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/5a9f8417-159c-450e-8fe9-c0a359c08850/efebeda1f282d7f6/widget-efebeda1f282d7f6.html"}
The service business is being built before it produces revenue.