BHP Group Limited Filing for 2026-06-30: price did the work in FY2026, and the guidance points to a volume trough ahead (BHP)

BHP Group Limited Filing for 2026-06-30: price did the work in FY2026, and the guidance points to a volume trough ahead. BHP's FY2026 revenue of US$58.8 billio…

BHP Group LimitedPeriod 2026-06-30Published 2026-08-17Updated 2026-11-24

Financial reporting period: FY2026, the year ended 30 June 2026 (audited annual report on Form 20-F, filed 18 August 2026; IFRS; reporting currency US dollars)

Comparable periods used: FY2025 (year ended 30 June 2025) for the year-on-year comparison, and FY2024 (year ended 30 June 2024) for the two-year view. Because this is an annual filing, no standalone prior quarter is available for a quarter-on-quarter comparison; the nearest current-quarter evidence is the operational review for the quarter ended 30 September 2026, which is used separately and explicitly below.

Conclusion

FY2026 was a price-driven result layered on flat volumes, and the same filing guides copper output down 8% to 16% for FY2027 while writing down the potash project by US$2.3 billion, so FY2027 earnings will be lower than FY2026 even if the copper price holds.

Revenue rose 14.6% to US$58.8 billion and underlying profit attributable to shareholders rose 30% to US$13.2 billion, but copper output fell 3% to 1,953 kilotonnes and iron ore volumes rose 1% to a record 265 million tonnes.1

The company's own bridge shows prices adding US$7.3 billion to the change in profit before depreciation and unusual items, offset by US$1.2 billion of lost volume and US$1.6 billion of inflation, currency and fuel.1 Underneath the reported numbers, three things changed materially: the earnings mix moved decisively to copper, the balance sheet was recapitalised without selling assets, and the cost of one major growth project rose enough to be written down by US$2.3 billion.

Key figures

Metric FY2026 (year to 30 Jun 2026) FY2025 (year to 30 Jun 2025) FY2024 (year to 30 Jun 2024) YoY change (FY2026 vs FY2025)
Revenue (US$m) 58,760 51,262 55,658 +14.6%
Underlying EBITDA (US$m) 32,947 25,978 29,016 +26.8%
Profit from operations, statutory (US$m) 23,869 19,464 17,537 +22.6%
Net finance costs (US$m) (1,455) (1,111) (1,489) +30.9%
Total taxation expense (US$m) (9,388) (7,210) (6,447) +30.2%
Profit attributable to shareholders (US$m) 9,833 9,019 7,897 +9.0%
Exceptional items, after tax (US$m) (3,371) (1,138) (5,763) loss widened by US$2.2bn
Underlying profit attributable (US$m) 13,204 10,157 13,660 +30.0%
Basic earnings per ordinary share (US cents) 193.6 177.8 155.8 +8.9%
Underlying return on capital employed 26.1% 20.6% 27.2% +5.5 percentage points
Net operating cash flow (US$m) 21,778 18,692 20,665 +16.5%
Capital and exploration expenditure (US$m) 10,257 9,794 9,273 +4.7%
Free cash flow (US$m) 9,767 5,342 11,903 +82.8%
Dividends determined for the year (US$m) 8,739 5,589 7,419 +56.4%
Net debt at 30 June (US$m) 8,694 12,924 9,120 reduced by US$4.2bn
Gearing 13.4% 19.8% 15.7% -6.4 percentage points
Non-controlling interests' share of profit (US$m) 3,193 2,124 1,704 +50.3%

Underlying profit attributable to shareholders is reported profit attributable to shareholders plus the after-tax exceptional items; the FY2026 and FY2025 figures reconcile to the exceptional items disclosed in the audited statements. Free cash flow is BHP's own definition, operating cash flow less investing cash flow, and it differs from operating cash flow less capital spending because FY2025 included the US$2.1 billion acquisition of a 50% share of the Vicuña joint venture.1

{"title": "BHP FY2026 key financials against FY2025 and FY2024 (US$ million)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/914af962a80991fe/widget-914af962a80991fe.html"}

Chart reused from the company research report, on the same FY2026 filing data.

What drove the change

Price, not volume. Higher average realised copper, iron ore and steelmaking coal prices lifted revenue by US$7.5 billion, partly offset by lower sales volumes at Escondida, where the planned concentrator feed grade fell to 0.90% from 1.02%, and in Pampa Norte, which contains Spence and Cerro Colorado and fell 21% to 213 kilotonnes on complex ore and lower cathode feed grade.1 Expenses excluding net finance costs rose 11% to US$36.0 billion, including the US$2.3 billion Jansen impairment, US$1.2 billion of higher third-party commodity purchases at Antamina, US$0.7 billion of depreciation on newly capitalised assets and US$0.6 billion of wage and raw-material inflation, partly offset by US$1.5 billion of favourable inventory movements.1

{"title": "BHP underlying EBITDA bridge (FY2025 to FY2026, US$ million)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/3cf5ccaa94335883/widget-3cf5ccaa94335883.html"}

Chart reused from the company research report.

Copper became the centre of the group. Copper revenue rose 28.8% to US$29.0 billion and its underlying EBITDA rose 47.5% to US$18.2 billion, while iron ore revenue rose 4.2% to US$23.9 billion with EBITDA almost flat at US$14.5 billion and coal EBITDA at US$0.8 billion.1 On BHP's own contribution basis, copper supplied 54% of group underlying EBITDA in FY2026 against 45% in FY2025, iron ore 43% against 53%, and coal 3%.1 Copper realised US$5.74 a pound against US$4.25 in FY2025; by-product revenue of gold, silver, uranium, zinc and molybdenum rose 45% to US$4.5 billion, and Escondida's unit cost fell 10% to US$1.07 a pound while Copper South Australia's fell 73% to US$0.32 a pound.1

{"title": "BHP segment revenue and underlying EBITDA by commodity (FY2024–FY2026, US$ million)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/e0630473016c1494/widget-e0630473016c1494.html"}

Chart reused from the company research report.

Margins moved in opposite directions. Copper's underlying EBITDA margin rose from 51% in FY2024 to a record 70% in FY2026, iron ore's fell from 68% to 61%, and coal's stayed in the mid-teens.1

{"title": "BHP underlying EBITDA margin by segment, excluding third-party products (FY2024–FY2026, per cent)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/7113ac7e636c95ae/widget-7113ac7e636c95ae.html"}

Iron ore held its margin; coal did not. WAIO produced a record 257 million tonnes at a unit cost of US$19.66 a tonne, up from US$18.56, against a realised price of US$84.56 a wet metric tonne, up from US$82.13.1 Coal steelmaking coal production rose 3% to 18.6 million tonnes at US$210.21 a tonne and energy coal rose 9% to 16.4 million tonnes at US$104.28 a tonne, but the segment's underlying return on capital employed was zero, and it absorbed only US$415 million of the group's US$9.8 billion of capital expenditure while US$1.8 billion went to unallocated items including potash.1

Two charges explain the gap between reported and underlying profit. The US$2.3 billion Jansen impairment followed a January 2026 review that raised the Stage 1 investment estimate to US$8.4 billion including contingencies from a preliminary US$7.0–7.4 billion range, citing inflationary and real cost escalation, design changes and lower productivity, with first production still on track for mid-2027.1 The second, US$1.1 billion, relates to the Samarco dam failure of 2015, of which US$778 million was a provision, US$600 million net finance costs and US$215 million of direct costs, offset by US$458 million of favourable derivative fair-value movements and US$64 million of insurance proceeds.1 Samarco is a recurring cash cost, not a one-off accounting entry: it consumed roughly US$2.0 billion of cash in FY2026.

The audited income statement, from revenue down to what shareholders received.

{"title": "BHP audited income statement bridge from revenue to profit attributable to shareholders (FY2026, US$ million)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/d3db9373ea6d2c0f/widget-d3db9373ea6d2c0f.html"}

Cash conversion held up, and the balance sheet changed shape. Net operating cash flow rose to US$21.8 billion. Net income tax and royalty-related taxation paid was US$9.5 billion, and working capital absorbed US$1.5 billion as inventories rose to US$6.6 billion and receivables to US$5.0 billion, consistent with higher prices rather than slower collection.1 Net debt fell to US$8.7 billion, inside the company's own US$10–20 billion target range, and gearing fell to 13.4%.1

{"title": "BHP cash generation on the company's own definitions (FY2024–FY2026, US$ million)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/6af6568dd3d914d7/widget-6af6568dd3d914d7.html"}

The financing innovation is the most important structural change, and part of it lands in FY2027. BHP raised US$4.3 billion in FY2026 through a silver stream: Wheaton Precious Metals paid upfront for the silver produced at BHP's share of Antamina, settled by metal credits with no physical delivery. A further US$2.0 billion from Global Infrastructure Partners for a 49% stake in a partnership holding BHP's share of WAIO's inland power consumption was completed on 18 August 2026, after the balance sheet date, so it is not in the US$8.7 billion of net debt reported above.1 The silver stream is booked as a liability of US$4,273 million, drawn down as silver is delivered; in plain terms, part of future by-product income has already been sold for cash today.

The minority interest is large and growing, and it belongs in any valuation. BHP owns 57.5% of Escondida, so the other shareholders took US$3,193 million of FY2026 profit, 19.5% of the group's after-tax profit, and hold US$5,398 million of its equity.1 Escondida's revenue of US$17.1 billion sits inside the group's US$58.8 billion of revenue and its profit inside the group's EBITDA, but only 57.5% of it accrues to BHP shareholders.

{"title": "BHP balance sheet structure including minority interests (FY2025–FY2026, US$ million)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/cf08b952316fbd24/widget-cf08b952316fbd24.html"}

What the filing changes for the forecast and the valuation

The FY2027 guidance is a volume trough. Copper is guided to 1,650–1,800 kilotonnes against 1,953 in FY2026, with Escondida at 1,000–1,100 kilotonnes on feed grade of about 0.70%; WAIO is guided to 253–264 million tonnes at US$20.25–21.75 a tonne against US$19.66 actual.1 Volume and unit cost therefore move against each other in FY2027.

The first quarter of FY2027 confirmed both halves of that picture. Group copper production fell 19% year on year to 400.7 kilotonnes, with Escondida down 23% to 252.6 kilotonnes, on lower grade, scheduled maintenance, severe Chilean weather and a temporary suspension of mining after a fatality on 23 September 2026; full-year production and unit-cost guidance were left unchanged. Realised copper rose 53% year on year to US$7.01 a pound, iron ore fell 9% to US$76.27 a wet metric tonne, steelmaking coal rose 34% to US$242.82 a tonne and energy coal rose 23% to US$116.60 a tonne.2

{"title": "BHP realised copper price and spot reference points (FY2025 to November 2026, US$ per pound)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/48ae6b272f3382d1/widget-48ae6b272f3382d1.html"}

Effect on the valuation. The FY2027 model takes the guided volumes, the guided cost step-up and a copper price close to spot rather than the September peak, and produces a value of US$29, US$55 and US$81 an ADS in the bear, base and bull cases, against a market price of US$70.60 on 23 November 2026.3 Two corrections to the bridge matter here. First, the multiple is applied to consolidated EBITDA while the equity belongs to BHP shareholders, so the Escondida minority has to be deducted; capitalising its earnings at ten times removes about US$10 an ADS, and its book equity of US$5.4 billion is the reference floor. Second, net debt should be taken after the US$2.0 billion received on 18 August 2026, which is a FY2027 cash flow.

What the price already assumes. At US$70.60, the ADR discounts a copper price near US$8.00 a pound on FY2027 guided volumes at 6.0x forward EBITDA, or about US$7.20 at 6.5x, against a market near US$5.50 a pound in late November 2026.4

{"title": "BHP scenario value per ADS against the market price (US$ per ADS)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/dc68389153786967/widget-dc68389153786967.html"}
{"title": "BHP value per ADS at different copper prices on FY2027 guided volumes (US$ per ADS)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/95fd0171007cbe49/widget-95fd0171007cbe49.html"}

A cross-check from the consensus data points the same way. The published consensus earnings series is on an underlying basis per ADS: it matched BHP's actual underlying earnings per ADS to within 1.4% in FY2024 and FY2025 and was 3.5% below the FY2026 actual.5 The June 2026 consensus FY2027 earnings of US$4.93 an ADS are 15% above our base case and imply copper near US$6.85 a pound, and the market pays 14.3x that figure.5 Consensus predates both the FY2026 result and the November copper correction.

What the market did with the filing. The ADR opened September at US$93.03, reached US$94.49 and closed at US$70.60 on 23 November, a fall of 24% in under three months as copper corrected.6

{"title": "BHP ADR daily price and volume (Sep 1 to Nov 23, 2026)", "url": "https://aistockvalue.com/api/v1/stockmind/report-assets/35f51039-94a6-4808-8cc2-181b27a8ce42/15584dada1d36a53/widget-15584dada1d36a53.html"}

Risks and counterevidence

  • Safety. Two colleagues died in the September 2026 quarter, at Escondida and Peak Downs, after a fatality-free FY2026 in which the remuneration scorecard rewarded safety outcomes.21 Lost mining time is a volume cost, not only a moral one.
  • Capital cost creep. The Jansen estimate rose by more than US$1 billion in one year, and the South Australian copper plan announced on 23 November 2026 carries a total of US$15.1–19.0 billion across two phases, with final investment decisions staged from the second half of calendar 2027 to 2032 and an indicative internal rate of return of 14% to 17%.17
  • Counterevidence. The balance sheet can fund the pipeline: net debt is below the target range, the US$5.5 billion revolving facility is undrawn, ratings remain A1/A stable, and management said at the half-year results it saw up to US$10 billion of further capital unlockable and expected around US$60 billion of attributable free cash flow over five years at spot prices.8
  • Concentration. China took 58% of FY2026 revenue, and copper and iron ore together produced 97% of group underlying EBITDA.1

Gaps requiring confirmation

  • FY2027 earnings are not yet reported; the forecast above rests on guidance and one quarter of actuals rather than a half-year result.
  • The value placed on the Escondida minority is an estimate, not a disclosed figure, and moves the base case by roughly US$5 an ADS for each two turns of the multiple applied to its earnings.
  • The provider data set used for cross-checks reports FY2026 operating income of US$25.5 billion against US$23.9 billion of statutory profit from operations in the audited statements, and its balance-sheet series does not reconcile assets to liabilities and equity; the audited statements are used as the factual basis here.6
  • The South Australian expansion, the Vicuña joint venture and the San Manuel disposal are announcements, not contracted outcomes; their capital amounts and timing are company statements.
  • Segment unit-cost definitions differ from the cash-cost measures some peers publish, so cost comparisons across companies are indicative rather than exact.

Related research

Sources

  1. [1] 2026-08-18_20-F · SEC 2026-08-18 Read the original
  2. [2] sec_6k_2026_10_21 · www.sec.gov Publication date not stated Read the original
  3. [3] BHP Group Limited valuation data packet · AI StockValue 2026-06-30
  4. [4] Copper Falls Below $12,000 as AI Hype Fades · www.briefs.co Publication date not stated Read the original
  5. [5] Analyst consensus and rating changes · Programmatic data 2026-06-22
  6. [6] BHP Group Limited financial data packet · Programmatic data 2026-06-30
  7. [7] sec_6k_2026_11_23 · www.sec.gov Publication date not stated Read the original
  8. [8] 2026-Q2-earnings-call · Programmatic data 2026-02-17